Saturday, 28 January 2012

Week 1

This is the 2nd week but I did not have time to update the stuff on last week as it was the first week of the semester 1 2012. So, everything is a little hectic and only now I can update things that I have done for the 1st week.
    FYP briefing was held on 17/1/2012(Tuesday) by FYP committee. I'm not able to attend the briefing since I have class during that time but I has been informed with my friend that the briefing is all about the blog that us, the FYP's student need to create. As well as about the t-shirt that need to be worn during Engineering's Day. 
   Next, I had a meeting with my supervisor on 20/1/2012. We talked about gantt chart and I had to do some correction to my gantt chart as per advice by my supervisor. We also did some discussion on my circuit diagram as I have a slightly concerns about it. 
this is the Gantt chart that i've already made some correction.. 
    Therefore, I decided to reduce the range of frequency and make only one type of frequency that is the minimum one. This is to make the circuit simpler as this project is only to built up the prototype. Wide range of frequency can be done in next project perhaps. ;)
    
    

No comments:

Post a Comment